A major kitchen renovation is one of the most rewarding investments you can make in your home, but living without a functional kitchen can feel daunting without a clear roadmap. Knowing the exact sequencing of demolition, cabinetry, countertops, and trades keeps your project stress-free.
Phase 1: In-Home Consultation & 3D Visualization (Week 1–2)
Every successful project begins with precision measurements and lifestyle planning. Our design specialists visit your home to analyze your workflow, storage pain points, and utility locations. We then translate your vision into an interactive 3D rendering where you can test cabinet configurations, island dimensions, and color schemes before finalizing orders.
Phase 2: Custom Fabrication & Material Sourcing (Week 3–5)
Unlike off-the-shelf big-box cabinets, Laminance custom cabinets are precision-built to your room’s exact millimeter tolerances. During this fabrication window, countertop slabs (quartz, granite, or porcelain) are tagged, designer backsplash tiles are secured, and plumbing/electrical fixtures are staged to eliminate installation downtime.
Phase 3: Clean Demolition & Mechanical Rough-Ins (Week 6)
Dust control and floor protection come first. Our licensed crews remove old cabinetry, countertops, and appliances while updating electrical circuits for under-cabinet LED lighting and dedicated appliance outlets. Plumbing lines are inspected and repositioned for optimal sink and dishwasher placement.
Phase 4: Cabinet Installation, Countertop Templating & Finishing (Week 7–8)
Cabinet boxes and face frames are laser-leveled and anchored securely. Countertop specialists take digital laser templates, fabricate cutouts, and install surfaces. Backsplash tile, soft-close hardware, fixtures, and touch-up painting conclude with a thorough walk-through and cleanup.